Not just identifying problems - identifying solutions
A “moment in time” monitoring process carried out by our competent and experienced Health, Safety and CDM consultants.
We look for existing and potential hazards while coaching and engaging with site workers in the process. We identify solutions that are practical and effective – so we are not just identifying problems. Where good management controls and behaviour are found, these are documented in the inspection too.
Carried out by carried out by our competent and experienced Health, Safety and CDM consultants.
Management & documentation
- Site Management Paperwork
- Competence
- Risk Assessments and Method Statements
- Permits
- Temporary Works
Working at height
- Working at Height
- Scaffolding
- Access Platforms
- Mobile Towers, Podiums
- Steps and Ladders
Site Operations
- Lifting Operations
- Groundworks
- Traffic, People and Plant
- Tools and Equipment
- Electricity
Hazardous materials & fire
- Asbestos
- Fire
- COSHH and DSEAR
People & environment
- Work Environment
- Welfare and First Aid
- Occupational Health
- PPE
What it does depends on who you are
Clients, principal contractors and contractors each have different duties under CDM – so the inspection does a different job for each.
Clients
If you are a client you are required to make sure that your principal contractor is fulfilling their duties under CDM 2015. The report provides details not only on compliance but on how improvements can be made.
Principal Contractors
As part of your duties and responsibilities under CDM you need to know how your site, management and contractors are performing. The inspection is a simple way of doing this for Health, Safety, Fire and CDM.
Contractors
Contractors are often asked to carry out regular independent inspections - this is where Complisafe come in. We have bespoke inspections for contractors that deliver a percentage score and a succinct report on performance. Our consultants are always happy to engage directly with your main contractor and feed back to company Directors when required.
A proactive legal requirement
The monitoring and review of preventative and protective measures is a requirement of the Management of Health and Safety at Work Regulations. Routine inspections check those measures are in place and effective - demonstrating a proactive approach and that actual performance is being monitored. They’re needed for principal contractors, clients, accreditations and management systems - but most of all to prevent injury and ill health.
On site, engaging with the people doing the work
Inspections are carried out by our competent and experienced consultants – observing real activity, not just reviewing paperwork.
-
We meet the site manager
Inspections start with a brief meet and catch-up with the site manager or supervisor and, where relevant, a review of the outstanding items from the last inspection.
-
We inspect and observe work in progress
We inspect the site and observe the work and activities taking place at the time, engaging with workers - and where required, asking for unsafe activities to be stopped to prevent injury or ill health.
-
We check documentation and competence
Documentation, competencies, risk assessments and methods of work appropriate to that inspection are all reviewed.
-
We summarise, then report
We discuss future planned works before summarising the inspection with the site manager or supervisor. A written inspection report is then provided with an action plan.
Cheaper than the alternative
The cost of inspections is competitive – and certainly cheaper than the £183 hourly rate applied if you get a visit from the HSE and a material breach is found on your site.
We discuss fees with every client so we understand the type and number of projects you’re involved in, the frequency of inspections required, the locations of the sites, and any nuances on the project.
What is a material breach?
Something an inspector considers serious enough that they need to formally write to the business requiring action. If the inspector gives you a notification of contravention (NoC) after their visit, you’ll have to pay a fee. The NoC must include:- the law the inspector considers has been broken
- the reason(s) for their opinion
- notification that a fee is payable to HSE